상품홍보 Do you want to change the displacement of the electrical control local…
페이지 정보
본문
Is the hydroelectric power remodeling partial or complete?
1. Local reconstruction of electric displacement:
It is to modify and improve the navigation route on the basis of the existing line, and at the same time maintain the immobility of the main line. And do some waterway remodeling according to one's own needs.
The advantage is that it saves money and time. However, because it is reconstructed on site, the materials we purchased are different from the materials used by the developer, which may have an impact later.
2. Overall reconstruction of electric displacement:
It is to thoroughly discard the waterway route reconstructed by the original contractor and remodel it according to one's own needs and new specifications.
The cost budget will increase significantly and it will take more time than reconstruction on site.
Whether water and electricity flow to the ground or above:
① It is recommended to use the ceiling, except for places where water is needed in the ceiling, kitchen, and toilet. ② It is recommended to walk on the floor in places where water is not needed, such as the living room, bedroom, and porch.
The main switch, lighting, public outlet, kitchen outlet, toilet outlet, living room air conditioner, main sleeping air conditioner, sub sleeping air conditioner each need one line, the refrigerator can be used for short-term business trips!
5, TV background wall:
Behind the background wall of the network cable socket, 50 PVC cable tubes are embedded, and the network cable and power cable are routed through the pipeline, so that the end of the messy wire is not visible! The location of the outlet on the TV background wall must also be planned in advance.
6, Strong and weak electric box provided by the developer:
The position is conspicuous and the style is not beautiful, so it can be switched during the hydroelectric power modification period. Here is the secret: buy a decorative painting of a strong electric box on the Internet and cover it perfectly!
7, Lighting:
The main lamps in the living room and bedroom should be double-control lamps. The entrance cabinet and kitchen hanger should leave the lighting line, and the lighting line can be added in the later stages.
8, Both sides of the bed headboard:
Two outlets are provided on both sides of the bed, so you can charge your mobile phone or use a desk lamp to prepare for emergencies.
9, if the projection screen is installed:
The outlet must be left in the screen slot! If the projector is hung up, the projector socket must be reserved on the sofa wall.
10, after the water pipe is completed, pressurization is required:
Do not omit pressing! If it does not exceed 0.05 MPa within 30 minutes, it is passed!
1. Local reconstruction of electric displacement:
It is to modify and improve the navigation route on the basis of the existing line, and at the same time maintain the immobility of the main line. And do some waterway remodeling according to one's own needs.
The advantage is that it saves money and time. However, because it is reconstructed on site, the materials we purchased are different from the materials used by the developer, which may have an impact later.
2. Overall reconstruction of electric displacement:
It is to thoroughly discard the waterway route reconstructed by the original contractor and remodel it according to one's own needs and new specifications.
The cost budget will increase significantly and it will take more time than reconstruction on site.
Whether water and electricity flow to the ground or above:
① It is recommended to use the ceiling, except for places where water is needed in the ceiling, kitchen, and toilet. ② It is recommended to walk on the floor in places where water is not needed, such as the living room, bedroom, and porch.
The main switch, lighting, public outlet, kitchen outlet, toilet outlet, living room air conditioner, main sleeping air conditioner, sub sleeping air conditioner each need one line, the refrigerator can be used for short-term business trips!
5, TV background wall:
Behind the background wall of the network cable socket, 50 PVC cable tubes are embedded, and the network cable and power cable are routed through the pipeline, so that the end of the messy wire is not visible! The location of the outlet on the TV background wall must also be planned in advance.
6, Strong and weak electric box provided by the developer:
The position is conspicuous and the style is not beautiful, so it can be switched during the hydroelectric power modification period. Here is the secret: buy a decorative painting of a strong electric box on the Internet and cover it perfectly!
7, Lighting:
The main lamps in the living room and bedroom should be double-control lamps. The entrance cabinet and kitchen hanger should leave the lighting line, and the lighting line can be added in the later stages.
8, Both sides of the bed headboard:
Two outlets are provided on both sides of the bed, so you can charge your mobile phone or use a desk lamp to prepare for emergencies.
9, if the projection screen is installed:
The outlet must be left in the screen slot! If the projector is hung up, the projector socket must be reserved on the sofa wall.
10, after the water pipe is completed, pressurization is required:
Do not omit pressing! If it does not exceed 0.05 MPa within 30 minutes, it is passed!
link 0 url 0 link 1 url 1 link 2 url 2 link 3 url 3 link 4 url 4 link 5 url 5 link 6 url 6 link 7 url 7 link 8 url 8 link 9 url 9 link 10 url 10 link 11 url 11 link 12 url 12 link 13 url 13 link 14 url 14 link 15 url 15 link 16 url 16 link 17 url 17 link 18 url 18 link 19 url 19 link 20 url 20 link 21 url 21 link 22 url 22 link 23 url 23 link 24 url 24 link 25 url 25 link 26 url 26 link 27 url 27 link 28 url 28 link 29 url 29
- 이전글Title: Tasty Haitian Holiday Foods Techniques You Should Know 24.10.25
- 다음글The Benefits Of Small L Shaped Couch At A Minimum, Once In Your Lifetime 24.10.25
댓글목록
등록된 댓글이 없습니다.